Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

AbouRizk, S M and Wales, R J (1997) Combined Discrete-Event/Continuous Simulation for Project Planning. Journal of Construction Engineering and Management, 123(01), 11–20.

Crowley, L G (1997) Robust Statistical Estimators for Use within Competitive Bid Data. Journal of Construction Engineering and Management, 123(01), 53–63.

Daoud, O E K (1997) The Architect/Engineer's Role in Rehabilitation Work. Journal of Construction Engineering and Management, 123(01), 1–5.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(1)
  • Abstract:
    Rehabilitation projects often suffer from delays and escalating costs. This may be attributed to a high degree of uncertainty in defining the scope of work for these projects during the design stage. This is particularly true for rehabilitation work on structures that suffered a catastrophe such as fire or war damage. Reasons for these problems are reviewed with emphasis on the role of the architect/engineer (A/E) in avoiding underestimation of required work during the stages of the project. Many common problems could be avoided if a more thorough survey was conducted of the damaged building at the initial design stage. Changes to the scope of work during the construction stage may cause serious delays and cost overruns. Recommendations are given to minimize ambiguities in the scope of work and avoid disputes among the parties to the contract. This can be achieved by employing an experienced A/E and by making sound decisions throughout the project span.

Elazouni, A M (1997) Constructability Improvement of Steel Silos during Field Operations. Journal of Construction Engineering and Management, 123(01), 21–25.

Everett, J G and Farghal, S H (1997) Data Representation for Predicting Performance with Learning Curves. Journal of Construction Engineering and Management, 123(01), 46–52.

Farghal, S H and Everett, J G (1997) Learning Curves: Accuracy in Predicting Future Performance. Journal of Construction Engineering and Management, 123(01), 41–45.

Kangari, R and Miyatake, Y (1997) Developing and Managing Innovative Construction Technologies in Japan. Journal of Construction Engineering and Management, 123(01), 72–78.

Kartam, S, Ballard, G and Ibbs, C W (1997) Introducing a New Concept and Approach to Modeling Construction. Journal of Construction Engineering and Management, 123(01), 89–97.

Mondorf, P E, Kuprenas, J A and Kordahi, E N (1997) Segmental Cantilever Bridge Construction Case Study. Journal of Construction Engineering and Management, 123(01), 79–84.

Russell, J S, Jaselskis, E J and Lawrence, S P (1997) Continuous Assessment of Project Performance. Journal of Construction Engineering and Management, 123(01), 64–71.

Shi, J and AbouRizk, S M (1997) Resource-Based Modeling for Construction Simulation. Journal of Construction Engineering and Management, 123(01), 26–33.

Songer, A D and Molenaar, K R (1997) Project Characteristics for Successful Public-Sector Design-Build. Journal of Construction Engineering and Management, 123(01), 34–40.

Tiong, R L K and Alum, J (1997) Final Negotiation in Competitive BOT Tender. Journal of Construction Engineering and Management, 123(01), 6–10.

Touran, A, Sheahan, T C and Ozcan, E (1997) Rational Equipment Selection Method Based on Soil Conditions. Journal of Construction Engineering and Management, 123(01), 85–88.